Friday, May 17, 2013

WIP 1: MG CATERBALL CT01 - E.O.G.T


This build is for fun and for my collection which I don't really wanted in to enter any tournament. This build consist of a lot of Balls from master grade and high grade. This terrain vehicle will be completed with a diorama. I'm going to build 2 trains where one will be equipped with weapon and supported with 4 extension mechanical legs and another one with off-road wheels which I'm going to sacrifice my MISB plastic tank model kit.

Wednesday, May 8, 2013

MECHA FEATURES: MG UNICORN 03 ROC FULL FRONTAL USE


Another version of unicorn gundam as there are normal unicorn and banshee unicorn. Modeled by RedBrick. The red color and the build basically represent a bit of sinanju concept. At the back of the kit, there are three also propellent thruster arrange in one line to increase the feel and concept of sinanju in this kit. Great painting finishing,  decals and neat build. Well Done!

Monday, May 6, 2013

MECHA FEATURES: TOURNESOL


 A mobile suit with diorama really catch my eyes nowadays. Made by Satoshi Honjo. The diorama tell us that this MG Zaku II is been left after the war, so the mobile suit become a place for recreation and place for the boys to hang around everyday. In term of the structure of the cliff and the water, I must say It were awesome and superb. Well Done!!

Wednesday, May 1, 2013

MECHA FEATURES: HG ZAKU WORKER by NAGAI


Mecha feature in this post cover HG Zaku Worker by Nagai. Details as usual since this kit just came out plain from the box. In the end, the kit came out with a pair of extension mechanical hand and details were add on too. The coloring also plays major roll, weathered yellow increase the feel of mecha to this build. Well done kit!

Sunday, April 28, 2013

MECHA LEG MECHANISM AND CONCEPTS


I want to share about mecha leg concept which I think this might becoming helpful for us if we are seeking for an idea to scratch build the mechanism and the design of the leg. There are various types of mechanism here which I believed at least a pair of piston is required for the flexibility of the leg. As for my upcoming project, I need to prepare the very easy mechanism which require me to less scratch build the parts since im going to produce 12 of it. My upcoming project will be MG Twin Cater-Ball Train. This photo references will help to imagine and structuring the upcoming outcome for the build.